MISSION OF COAL INDIA - To produce and market the planned quantity of coal and coal products efficiently and economically in an eco-friendly manner with due regard to safety, quality and conservation. VISION OF COAL INDIA - To emerge as a global player in the primary energy sector committed to provide energy security to the country by attaining environmentally & socially sustainable growth through best practices from mine to market.

PROJECT & PLANNING

Project & Planning Dept. Portal

ANNEXURES Click Here

Command Areas of Operations:

There are 14 numbers of operating Areas with 78 numbers of working mines, 49 Underground mines, 20 opencast mines and 9 mixed mines.

 

Research and Development Projects:

Detailed status of implementation of ongoing R&D projects funded under R&D grant of CIL is given in Annexure-I.

 

S&T Projects:

Detailed status of implementation of ongoing S&T Research projects funded under S&T grant of MoC is given in Annexure-II.

 

Modernization of Underground Mines:

In order to increase the level of modernization and mechanization in underground mines, intermediate technology deploying LHD/SDL was introduced in 57 nos. of mines of ECL till 2019-20. As on 31.3.2020, 244 nos. of SDLs, 40 nos. of LHDs and 134 nos. of UDMs were on roll (inclusive initial Survey-off equipment) in different underground mines of ECL. During 2019-20, production achieved from SDLs was 4.17 MT, from LHDs was 1.02 MT and from 2 nos Road header (Part of Longwall Package) is 0.11 MT.

“Mass production technology” by deploying Continuous Miner combined with Shuttle Car (6 sets) had been deployed at Jhanjra, Sarpi and Kumardih-B UG projects and is running successfully. The production achieved during 2019-20 from 3 Nos. of Standard Height Continuous Miner and 3 nos. Low height Continuous Miner was 2.43 MT. In Jhanjra, Longwall technology is running successfully since August, 2016 & production during 2019-20 was 1.43 MT (Excluding Road Header). Overall underground coal production increased from 9.06 MT in 2018-19 to 9.21 MT in 2019-20 registering growth of 1.60%.

In addition to above the following steps are being taken for diversification / modernization of Coal Industry:

 

  • a) Coal Bed Methane (CBM): Project Feasibility Report (PFR) has been formulated and approved by ECL Board administratively under MDO concept on 22.09.2018 covering lease hold area of Satgram, Kunustoria & Sripur Area. CMPDIL prepared revised Notice Inviting Offer and Model Revenue Sharing Contact considering Directorate General of Hydrocarbon under MoP&NG’s suggestions and sent the same to CIL for approval with a copy to ECL.
  •  

  • b) Highwall Mining: The Highwall Mining is proposed to be introduced in Nimcha and Sripur Colliery. Contract agreement has been signed on 25.07.2018 for introduction of Highwall Mining Technology.
  •  

  • c) Man Riding System: During 2019-20 one set of Man Riding System has been introduced in Bansra UG Mine. Thus total number of functional Man Riding System is 10 (Ten) nos. viz. Jhanjra (3 nos. Free Steered Vehicle), Parasea, Nimcha, Bansra, Shyamsundarpur & Chinakuri Mine III (Chairlift System in each mine) and Chinakuri Mine I (2 nos. Battery Locomotive).
  •  

    Steps taken to improve underground coal production:

     

    Considering the various operational constraints, liquidation of upper seam, delay in availability of land for caving etc. actions have been taken to improve underground production mainly by introduction of Mass Production Technology deploying Continuous Miner with Shuttle Car in more number of underground mines in coming years like Khottadih, Tilaboni, Siduli, Parasea-Belbaid apart from gradual phasing out of manual operations with the intermediate technology. Action has been taken to introduce more UDMs keeping in view of shortage of Drilling gang due to superannuation and the dual purpose of availability of more coal at face and supporting as well.

     

    Details of Projects Formulation during the year 2019-20:

     

    Sl. No.

    Name of Project

    Capacity (MTY)

    Estimated additional Capital

    (` In Crore)

    1.

    Pandaveswar Dalurbandh (UG & OC)

    OC: 1.00

    UG: 0.54

    Departmental: 871.28

    Partial Outsourcing: 504.11

    2.

    Itapara OCP

    3.50

    Departmental: 1839.70

    Partial Outsourcing: 1202.00

    Outsourcing: 1036.59

    3.

    Chuperbhita  OCP

    4.00

    Departmental: 3403.87

    Outsourcing: 2634.70

    4.

    Sonepur Bazari Expansion OCP

    12.00

    Departmental: 5923.72

    Partial Outsourcing: 3430.00

    5.

    Nabakajora- Madhabpur Mine (UG & OC)

    UG: 1.32

    OC: 0.80

    Departmental: 984.11

    Partial Outsourcing: 636.27

     

    6.

    Dhangajore UG

    1.08

    Departmental: 641.39

    Partial Outsourcing: 363.56

    7.

    Mohanpur

    2.50

    Departmental: 1158.78

    Partial Outsourcing: 910.71

    8.

    Khandra NKJ UG

    0.70

    Departmental: 526.32

    Partial Outsourcing: 229.90

     

    Details of Projects Approval & Recommendation of Board of Directors of ECL for seeking approval of CIL Board during the year 2019-20:

     

    Sl. No.

    Name of the Project

    Capacity (MTY)

    Approved Capital Investment (` Cr)

    Date of Approval

    1.

    Shyamsundarpur UG (including Sarpi Unit)

    1.59

    483.65

    16.01.2020

    2.

    Expansion Project Report of Jhanjra UGP

    Nominal Capacity- 5.0 MTY

    Peak Capacity – 5.80 MTY

    1210.12

    16.01.2020

     

    Final approval of Projects by the Board of Directors of CIL during the year 2019-20:

     

    Sl. No.

    Name of the Project

    Capacity (MTY)

    Approved Capital Investment (` Cr)

    Date of Approval

    1.

    Parasea-Belbaid

    Re-organization UG

    2.07

    826.42

    22.07.2019

     

    Details of Projects Approval & Recommendation of Empowered Sub-Committee of CIL Board for seeking approval of CIL Board during the year 2019-20:

     

    Sl. No.

    Name of the Project

    Capacity (MTY)

    Approved Capital Investment (` Cr)

    Date of Approval

    1.

    Parasea -Belbaid

    Re-organisation UG

    2.07

    826.42

    09.05.2019

    2.

    Shyamsundarpur UG (including Sarpi Unit)

    1.59

    483.65

    18.03.2020

    3.

    Expansion Project Report of Jhanjra UGP

    Nominal Capacity- 5.0 MTY

    Peak Capacity- 5.80 MTY

    1210.12

    18.03.2020

     

    Capital Projects/Schemes:

     

    1. of New Project (Greenfield): 1 no. (Hura-C OCP)
    2. Expansion/Revision/Foreclosure of Projects: 12 nos. (Jhanjra Combined Project Report, Khottadih Expansion - OCP, Khottadih - CM, Kumardih-B CM, Mohanpur Expansion, New Kenda OC, Sonepur-Bazari Combined OCP, Chitra East OCP, Siduli Mix, Nakrakonda –Kumardih B OCP, Tilaboni UG and Parasea–Belbaid UG)
    1. Total: 17 nos.

     

    New Initiatives and Future Programme:

     

    Following initiative were taken in 2019-20 for augmentation of production from underground:

     

    1. a) Technological up-gradation and Modernization of existing UG mines: 23 nos. of UG Mines were undertaken for study of enhancement of production by Consortium of M/s. ISM, M/s. SCCL and M/s. PWC. This is as per the MoC/CIL’s directive. Report was submitted in January, 2018 and the same was accepted by Coal India Limited. Out of 23, three Project Reports (Siduli Mixed, Tilaboni UG and Parasea-Belbaid UG) were approved and five more Project Reports are under process of formulation/approval.

     

    1. b) Introduction of mass production technology Continuous Miner (CM): The following mines have been identified for introduction of CM:

     

     

     

     

     

     

    Sl. No.

    Name of Mine/Project

    Capacity

    (MTY)

    Estimated Capital in ` Cr.

    Status

    1.

    Khottadih CM UG

    0.60

    Risk-Gain - 127.17

    Commissioning is expected in 2020-21.

    2.

    Kumardih-B CM UG

    1.02

    Equipment Hiring - 117.90

    One LHCM commissioned in December, 2019. Tender Committee Recommendations for SHCM (one no.) is under process of approval.

    3.

    Siduli Mixed

    OC: 1.20

    UG: 1.63

    Equipment Hiring - 535.18

    Project Report was approved in May, 2018.

    4.

    Tilaboni UG

    1.86

    Equipment Hiring - 916.62

    Project Report was approved in February, 2019.

    5.

    Parasea-Belbaid UG

    2.07

    Equipment Hiring - 826.42

    Project Report was approved in July, 2019.

    6.

    Shyamsundarpur UG (including Sarpi Unit): 2 nos LH CM (additional)

    1.59

    Equipment Hiring - 483.65

    Project Report (November, 2019) was recommended by ECL Board on 16.01.2020. Same was recommended by ESC of CIL Board on 18.03.2020.

    7.

    Expansion Project Report of Jhanjra UGP: 2 nos. LH CM (additional)

    5.00

    Equipment Hiring - 1210.12

    Project Report (October, 2019) was recommended by ECL Board on 16.01.2020. Same was recommended by ESC of CIL Board on 18.03.2020.

    8.

    Nabakajora-Madhabpur Mixed

    UG: 1.32

    OC: 0.80

    Risk-Gain - 984.11

    Equipment Hiring - 636.27

    Project Report is under recast for incorporating new guideline of Mine closure plan.

     

    Foreign collaboration/Technology Absorption-Adaptation and innovation:

     

    1. i) Introduction of one no. Low Height Continuous Miner (LHCM) at Kumardih-B UG Mine: 1 set of LHCM has been commissioned during 2019-20 by M/s. JMS Mining Pvt. Ltd. in collaboration with M/s. Joy Global UK.

     

    1. ii) Introduction of one no. Continuous Miner at Khottadih UG Mine: Signing of Contract agreement with the agency M/s. CMATL-SXTD-CMML (China) consortium has been done on 14.09.2018. Equipment arrived at Mine site in March, 2020. Commissioning of same is expected in 2020-21.

     

    iii) Successful run of Powered Support Longwall Panel at Jhanjra R-VI Seam producing coal 1.45 MT 2018-19 and 2019-20 continuously.

     

    Status of achievement of with respect to major milestone activities of On-going projects for the year 2019-20:

     

    Details of MoSPI monitored On-going Projects of costing more than ` 150 Crore

     

    Sl.No.

    Name of Project

    Milestones

    Timeline for completion

    Status of achievement

    1.

    Sonepur-Bazari Combined OCP

    (Capacity: 8.00 MTY, Sanctioned Capital: ` 1055.05 Crore)

    Rehabilitation phase-III -150 PAFs (Part Shifting of Sonepur village)

    March, 2020

    Construction of houses by different PAFs is in progress. 3rd installment has been paid to 745 PAFs. 4th / final installment given to shifting of 12 nos. PAP’s of Sonepur Village site. 

    2.

    Hura-C OCP

    (Capacity: 3.00 MTY, Sanctioned Capital: ` 359.69 Crore)

    Approval of TCR and issue of LOA for construction of CHP

    March, 2020

    Under process

    3.

    Siduli OC & UG

    (Capacity: OC: 1.20 MTY & UG: 1.63 MTY Sanctioned Capital: ` 535.18 Crore)

    Possession/purchase of 15 Ha tenancy land

    March, 2020

    Under process

    4.

    Jhanjra Combined UG (Capacity: 3.50 MTY, Sanctioned Capital: ` 602.86 Crore)

    Issue of supply/purchase order for MUV for LHCM District

    March, 2020

    Action is being taken for review of specification of MUV.

     

     

     

     

    Status of achievement of MOU Target for the year 2019-20:

     

    Sl. No.

    Performance Criteria

    Unit in Measurement

    Target for the year

    Achievement

    1.

    Coal Production

    Million Tonne

    53.50

    50.401

    2.

    CAPEX (` in Crore)

    ` Crore

    1100.00

    894.68

    3.

    Percentages of value of CAPEX contracts / projects running / completed during the year without time / cost overrun to total value of CAPEX contracts running / completed during the year

    %

    100

    Not Achieved

     

    Other Major activities during 2019-20:

     

     

     

    Sl. No.

    Name of Project

    Activities/Milestones

    Target for the year

    Achievement

    1.

    Sonepur-Bazari Expansion OCP

    Possession of land 80 Ha

    March, 2020

    Possessed 25.42 Ha during 2019-20.

    Construction of CHP

    December, 2020

    Civil construction Work is in progress. Electrical and mechanical work will be completed in November, 2020. Commissioning is expected in December, 2020.

    2.

    Jhanjra Combined UGP

     

    Possession of 20 Ha    tenancy land

    March, 2020

    So far Possessed 10.84 Ha during 2019-20.

    Issue of Work order for construction of new Railway siding

    January, 2020

    Work order for construction of new Railway siding to M/s. RITES issued on 08.01.2020.

    4.

    Kumardih-B CM UG

    Commissioning of 1st set LHCM

    December, 2019

    Commissioning of 1st set LHCM done on 11.12.2019.

    5.

    Hura-C OC

    Possession of tenancy land

    25 Ha

    Land possessed 38.69 Ha.

    FC-II of forest land (260 Ha)

     

    May, 2019

    FC Stage-II has been issued by MoEF& CC, GoI on 21.05.2019.

    6.

    Chitra East OC

    Stage II FC
    (For 124.28 Ha of land)

    July, 2019

    FC Stage II granted by MoEF & CC, GoI on 10.07.2019.

    7.

    Khottadih Expansion OC

    Shifting of PAFs (Bouri Para)

    (417 nos.)

    March, 2020

    324 PAFs has been shifted. Shifting of balance PAFs Bouri Para is in progress.


    DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.

    Copyright 2019 EASTERN COALFIELDS LIMITED,
    Sanctoria, Post: Dishergarh, Dist.: West Bardhaman, W.B., PIN - 713 333 Tel: 0341-2520052-53, 2520414 Fax: 0341-2523574 Gram: EASTCOAL